Application for Water Well Construction Permit
This form must be completed in full. An incomplete
or defective application will be returned to the applicant. Corrections
must be submitted to the NRD within 60 days or the application will be canceled.
The District will either issue the permit with conditions attached,
or deny the permit, no later than 30 days after receipt of a complete and
properly prepared application and application fee. Read
Permit Restrictions here.
Print this form, complete and send it with $17.50 filing fee (payable
to the Lower Elkhorn Natural Resources District) to:
Lower Elkhorn Natural Resources District
P.O. Box 1204
Norfolk, NE 68702-1204
1. APPLICANT
INFORMATION
NAME: ______________________________
DWR AND NRD USE ONLY
ADDRESS: ____________________________
Late Permit ___
________________________________
Permit No.
LE-_______________
PHONE: (____) - _______________________
Registration
No._____________
Applicant is __ landowner, ___tenant, or ___ other
(specify)________________
Application if for __new well construction, or __existing well
modification.
2. PURPOSE OF WELL (select one category)
__Irrigation __Domestic __Livestock __Public
Water Supply
__Dewatering (0ver 90 days) __Ground Heat Exchanger
___Commercial/Industrial ___Recovery ___Ground Water Source
Heat Pump
___Monitoring ___Aquaculture ___Other
(specify)________________________
3. LOCATION OF THE PROPOSED WELL
_____________________County,
Township_______North,
Range______________ __East ___West, Section
number ____________
The well will be located _____________feet from the ___North
___South
section line, and will be _____________feet from the ___ East
____West
section line.
| The box at the right represents a one square mile section.
Please indicate in this box: 1.) The proposed location
of the well with an "X", and 2.) the proposed location of the water use area
by outlining the area.
If the water to be used outside of the above written legal description,
give the legal description of this area below:
____________County, Township__________North,
Range______________ ___East ___West
Section Number________________________
If possible, please mark the proposed well site with a flag. |
 |
4. IRRIGATION WELL INFORMATION
How many acres will be irrigated
__________Acres
Will a flow meter be used on the proposed new well?
___Yes ___No
What type of irrigation system is planned? ___Center
Pivot ___Gravity ___Other(specify)_________
What type of power supply will be used for the well?
___Electricity ___Fuel
Will the well be used in a system with other wells?
___Yes ___No If yes, how many?_____
Will fertilizer, chemicals, or animal waste be applied through
the irrigation system?_________
5. REPLACEMENT WELL AND WELL ABANDONMENT INFORMATION
Is this a replacement well? ___Yes ___No
If no, please proceed to section 6. If yes, you may not
need a permit; please contact
NRD for clarification.
The following questions are for replacement wells only. (See
note 2 below)
Registration number of the well to be
replaced:_______________.
Well to be replaced was last operated____________, 19_____.
Replacement well will be ___________ feet from the original
well.
Original well was decommissioned ______________, 19_____.
6. EXPECTED SPECIFICATIONS OF THE WELL AND
PUMP
Approximate date when construction will begin:
_____________, 19_____.
Estimated pump column diameter: ______ inches.
Estimated total depth of the
well:________feet
Estimated pumping capacity: _________gallons per
minute.
Estimated well casing diameter:
_______inches.
Please attach test hole log, if available.
Name of Well Driller:______________________
7. I certify that I am familiar with information contained in
this application, and its restrictions, rules, and regulations, and that
to the best of my knowledge and belief such information is true, complete,
and accurate.
This form must be completed in full and be accompanied
by a nonrefundable, $17.50 filing fee (payable to the Lower Elkhorn Natural
Resources District), and submitted to the District at the address listed
at top of page.
Date___________________ Signature of Applicant
__________________________
Date Approved___________________ NRD
Representative______________________
Permit Restrictions
1. Well permits are required prior to construction or a late
fee of $250 will be assessed.
2. Permits are not required
for replacement wells with an intended use of 90 days or less. A
replacement well is a well that replaces an abandoned well within 3 years
of the last operation of the abandoned well, and will provide water to the
same tract of land. Section 5 appears above in order to maintain a
standard application format for NRD's throughout the state. Please
contact the District
if you have questions about this section.
3. A permit must be obtained for an existing well that did not
require a permit, before it is modified into a well that would otherwise
require a permit.
4. If construction of the well is not complete within one year
of permit approval, a new permit will be required.
5. The well authorized by this permit must comply with well
spacing requirements set forth by state statutes.
6. Water wells constructed within 50 feet of a stream bank must
have a surface water right for that stream from the Nebraska Department of
Water Resources before construction of the well.
7. Any person who commences or causes construction of a well
for which the required permit has not been obtained, or who knowingly furnishes
false information regarding such permit shall be guilty of Class IV
misdemeanor.
8. This permit does not register the well with the Nebraska
Department of Water Resources. All wells are required to be registered
with the Nebraska Department of Water Resources within 30 days after the
well is completed.